|
| |
|
|
|
|
|
MESSAGE
FROM THE UNIC CLUB PRESIDENT
The UNIC
Club of Canada, Toronto has successfully sunk a borehole to provide water
for the Children's Clinic, Central Hospital Benin City. The project was
executed when the Club, represented by the President, Mr. Franklin Omoruna
accompanied by the Club's Speaker of the House, Mr. Johnbull Osayande and Mr. Henry
Ojo (member) were in Benin City between June 10 and July 2, 2004. The Borehole
Project consist of two 2500 litre overhead tanks that distribute water
to all parts of the hospital building.
All dilapidated
plumbing equipments within the hospital complex were
replaced and an agreement was solidified with the Borehole contractor,
Messrs. Fidia & Gita Group of Company to maintain the
borehole for the next 5 years at no cost to the government of Edo State. The borehole
was commissioned by the Edo State Honorable Commissioner for Works and
Water Resources on June 30, 2004.
The UNIC Club
of Canada, Toronto takes this opportunity to
thank everyone that contributed in one way or the other to the success of this project,
and also
call on all Edos in Diaspora to do their part in carry out any projects
that will benefit the generality of our beloved families back home,
Nigeria.
God
Bless you all.
Franklin
Omoruna
President,
UNIC Club of Canada, Toronto |
|
PROVISION
OF BOREHOLE WATER SUPPLY

UNIC Club of Canada, Toronto installs
Borehole Water Supply for the Children Hospital in Benin City, Edo State
of Nigeria. Commissioned June 30, 2004 |
BOREHOLE WATER
CONSTRUCTION

Broken
underground water pipes repairs.
Plumbing works on the toilets hospital toilets in readiness
to receive water from the borehole. |

•Construction
workers busy inserting drilling equipment into the ground to
get water to the surface.
|
Drilling of ground
water continues.
|
The UNIC
Club President at the center posed for picture with Edo
State Government officials Dr S. Omoregbe, Medical
Director (Right.) and Chairman , Hospital Management Board (Left.) at
the borehole construction site.
|

•Borehole
water supply construction in progress.
|
Installation
of overhead water tank for the borehole water supply
under construction.
|

Installation
of a supporting tank for the borehole water supply
under construction.
|
Borehole water
supply drilling successfully completed and Pump
installed.
|
The
UNIC Club President, Mr. Franklin Omoruna testing the borehole
water supply while Mr. Johnbull Osayande (second from right) and the site
engineers look on.
|
Mr. Johnbull
Osayande, also tested and confirmed efficient operation of the
borehole water supply. The UNIC Club President, Mr.
Franklin Omoruna (second from left), and Mr. Henry Ojo (member, 2nd from right)
looks on.
|
COMMISSIONING
OF BOREHOLE WATER SUPPLY

The UNIC
Club President (right), Mr. Johnbull Osayande and Mr.
Henry Ojo (members) pose for picture at
the commissioning of the borehole water supply.
|
Borehole
Water Supply awaiting commissioning.
|
The UNIC Club
representatives posed for picture with the Edo State Government and
hospital officials before the commissioning
of the borehole water supply.
|

President
and a member of the UNIC Club posed for picture before
the commissioning.
|
The UNIC
Club President, Mr. Franklin Omoruna (far Right.), addresses the
crowd at the commissioning of the borehole water supply.
|
Edo
State Commissioner for water (representing the State Governor)
addresses the crowd at the commissioning of borehole water
supply.
|

The
Edo State Commissioner for Water cut tape to
commission the borehole water supply.
|
UNIC Club President
present’s the tap and operational unit to the entourage.
|
UNIC
Club President gets a sample of the borehole water from the tap.
|
The Honourable
Commissioner also has a taste borehole water from the tap.
|
Edo State
Commissioner for Health tastes the borehole water,
and pronounces it good for public consumption.
|
The UNIC
Club President, Mr. Franklin Omoruna, on behalf of the UNIC Club of
Canada, Toronto, receives a thank you handshake from the Commissioner of
Health for the provision of borehole water supply to the Sick Children
Hospital, Benin.
|
Commissioner
Ikhariale hands over the key to the borehole water supply to the Medical
Director, Dr. S. Omoregbe. |
UNIC Club
representatives and the Edo State Government
representatives posed for picture with the
Children Hospital Staff during the commissioning of the
borehole water supply.
|
Certificate
of agreement reached between the club and the contractor to maintain
the borehole system for 5 years.
|

UNIC
Club President addresses press after the commissioning of the borehole
water supply. |
|
Home About
Us |
Constitution
| Contact
Us | Members
| Meetings |
Form| Projects
| President | Links | Foundation
| Executives | News
| UNIC Club | Edo
People | Feedback | |
|
The general content of this website are All rights reserved.
No part of this website may be reproduced or transmitted in any form or any means,
electronic or mechanical, including photocopying, recording, or by any information
storage and retrieval system, without permission in writing from
UNIC
Club of Canada, Toronto |
|